Rebuilding Taufua Beach Fales
Thank you we have come this far after swimming together with all that existed at Lalomanu Beach on the day of the Tsunami (29/09/09) .
We are pleased to announce that the works on the re-building of Taufua Beach Fales are underway.

There are two sites in which the work is being carried out.
 

Beach Site There are two major works to be undertaken.


Photo taken from what was Taufua B&B (Sigalu & Anita)
Romeo beach fales is behind the photographer

First is the sand reclamation on the beach. This work started on 19 Nov and may take more than a week. The sand reclamation will cover also the beach areas where the “overflow” fales were. This includes Sieni , Taufua B&B, and Romeo Beach Fale.

Temporary beach fales for day visitors will be erected. Along with the fales is a takeaway shop & bar. An ablution block will also be built.

The permanent beach fales will be built next year when the second major work on the beach site is completed.

Second is the construction of the retaining wall at the foot of the mountain along with the landscaping of where the family dwellings used to be.

The retaining wall and landscaping will be done in stages to cover the land areas occupied by Taufua Beach, Sieni, Taufua B&B and Romeo beach fales.

The site plan for the retaining wall and the proposed village like design of the beach fales will be published on the website as soon as it comes to hand.


The retaining wall will be about where the fence for the pigs is


Please check these URLs:
http://www.taufuabeachfales.ws; http://www.samoabeachfales.com and http://www.agamoana.ws
to keep in touch with the progress of the work being undertaken.
   

Mountain Site
 
Many of those who were guests at Taufua Beach Fale in July and September 09 had visited the mountain site where the Emergency House is being constructed. That house is almost complete and will be the family home and emergency house.

Between the family home and the edge of the cliff will be the double units. Building material for 6 units has been procured and the work on the foundations and slabs for 2 units will begin on 24th Nov 09.

The building of units will be in 2 stages. First is the construction of 6 units, the Restaurant and the Bar. This will be followed by the swimming pool and 6 more units.
 


At dusk volunteers Johnny & Johnny
nailing on flashings on the Emergency House

The units or accommodation on the mountain is an extension of Taufua Beach Fale and will be called Taufua Mountain View. Please go to http://www.agamoana.ws to keep abreast with the construction work on the mountain site.
The opening of Taufua Mountain View is being proposed for end of Feb 2010.


Site Plan for Mountain View Units